Water supply installation · Eixample · Sant Antoni · Sant Gervasi · Sarrià
Water supply installation in Barcelona the incoming network from comptador to manifold.
When the incoming water line drops pressure in summer or the comptador room shows a damp patch on the wall, the supply itself is the problem — not the bathroom fittings. Pere Solé replaces the section in multilayer PEX-AL-PEX, fits a central manifold with isolating valves per circuit, pressure-tests at 6 bar and signs the butlletí.
Water supply installation is the section between the building's water meter and your apartment's central manifold. It's the part that decides whether you have stable pressure in summer, isolating valves where you need them, and zero hidden joints behind tiled walls.
01
Five plumbing markers, this is one
Callout in occupied flat → plumber. Install fixture onto existing pipes → fixture installation. Full plumbing build inside reform → plumbing works. Drainage only → sewer. Incoming network from comptador to manifold = this page.
02
Multilayer PEX-AL-PEX
Aluminium core between two PEX layers — dimensionally stable, doesn't expand under hot water, doesn't kink, retains the bend. Press fittings only on hidden joints. We don't use compression fittings inside walls.
03
Manifold with isolating valves
One isolating valve per circuit at the central distribuïdor — bathroom 1, bathroom 2, kitchen cold, kitchen hot, washing machine, dishwasher, AC make-up. If a fixture leaks, you close one valve, not the whole apartment. Critical for occupied flats.
Replacement of one section of supply line — typically from the comptador to a wet zone, up to 8 m. New PEX-AL-PEX, isolating valve at both ends, pressure test, joint photograph. Used when only one branch of the supply has failed or carries lead.
From
€280
Time
½ day
New PEX-AL-PEX up to 8 mincluded
Isolating valve at both endsincluded
Pressure test 6 bar / 30 minincluded
Joint photograph for the fileincluded
Old pipe removal + recyclingincluded
Wall chase + plaster patch+€120
Full apartment supply
Complete incoming network from the comptador to the central manifold of the apartment, plus distributing circuits to every wet zone. Multilayer PEX-AL-PEX, isolating valve per fixture at the manifold, butlletí del aigua signed.
From
€1.250
Time
2-4 days
Everything in Single tramo × full apartmentincluded
Central manifold with isolating valvesincluded
One independent circuit per fixtureincluded
Hot loop from boiler if neededincluded
Butlletí del aigua signed by Pereincluded
Comunicat or llicència obra menor+€280
Commercial / pressure-boosted
Commercial local or larger apartment with a grup de pressió — pump set, expansion vessel, monitored pressure. Required when the building's static pressure is insufficient for the design flow rates. Individual quote after inspection.
From
€4.500
Time
5-10 days
Grup de pressió + expansion vesselincluded
Pressure transducer + control boardincluded
Stainless or PEX-AL-PEX networkincluded
Hot/cold loops with separate manifoldsincluded
Coordination with electrical for pump feedincluded
Llicència obra menorincluded
Common supply questions
Things owners ask before signing.
Plumbing works = the full plumbing rebuild inside a reform: incoming + drainage + fixture lines + butlletí. Water supply installation = the incoming line only — from the comptador to the central manifold. Smaller scope, scoped separately when only the supply needs renewing or when a building riser is being replaced.
Multilayer PEX-AL-PEX inside the apartment — fewer joints, no corrosion, dimensionally stable. Press fittings on hidden joints, no compression. Copper or galvanised only where the comunidad still requires it on the section before the apartment (some pre-war buildings have a fixed riser spec).
Yes. The cold network is charged to 6 bar for 30 minutes before any wall closes. We photograph the manometer and log the test. If the pressure drops more than 0.2 bar in 30 minutes, the wall doesn't close until the joint is found.
For a like-for-like replacement of the incoming line, comunicat covers it. If the manifold position changes or new walls get chased, llicència obra menor — 4-8 weeks at the Ajuntament. We file it as a separate line on the quote.
The comptador relocation is a separate request to Aigües de Barcelona — they own the meter and they need to issue the move authorisation. We coordinate with them, file the form, prepare the new piping route on our side, and reconnect once they fit the meter at the new location. Usually 4-6 weeks total.
Single tramo: a half-day on site. Full apartment supply: 2-4 working days plus the pressure-test wait. Commercial pressure-boosted system with grup de pressió: 5-10 days. Inside a turnkey reform the supply happens during first-fix and adds no separate calendar time.
Free site survey
Supply quote in 48h after the visit.
Send the address and a photo of the comptador room or the meter location. Pere visits within a week, checks the static pressure, surveys the route, and the line-by-line quote arrives 48h after.