Commercial design · Eixample · Born · Gràcia · 22@ · Sant Antoni
Commercial interior design in Barcelona retail, restaurant, salon, clinic.
Public-facing spaces have a different rulebook from offices and homes — DB-SI fire sectorisation, ventilation per use class (kitchen extract, salon air, gym CO₂), aforament limits, accessibility for clients, llicència ambiental. We design with the licence file in mind from sketch one.
Commercial projectsRetail, restaurant, salon, clinic since 2018
COAC
Architect-ledNúria Bosch + commercial bench
DB-SI
Fire sectorisationCode-compliant from sketch
5-8 wk
From brief to drawingsPlus licence file timeline
About this service
Designed for the customer journey — and for the licence file.
Two thirds of commercial projects in Barcelona stall on the licence — wrong fire sector, wrong ventilation extract for the use, no accessible WC. We start with the use class, the aforament, and the licence file requirements. Then we make it look right for the brand.
01
Use-class + licence first
Retail (small), restaurant, salon, clinic, gym — each is a different licence type with different constraints. We confirm with the Ajuntament Activitats office before signing the design fee. License file is part of Standard tier.
02
Ventilation per use
Restaurant: Class III kitchen hood (UNE-EN 16282) with vertical extraction to roof, fire damper, grease trap. Salon: chemical air extraction at 6-8 ach. Gym: CO₂ minimum 8 ach. Each use has its number — designed in, not retrofitted.
03
Customer journey + visual merchandising
Where does the customer enter, where does the eye land first, where is the cash desk in line of sight, where does the queue form. For retail this is the difference between «browsed and left» and «picked up and bought». Designed at sketch stage with traffic-flow studies.
04
Adjacent services
Office (private workspace, no public access) — see office design. Apartment — apartment design. House — private house. Whole-build, not just design — custom budget after the survey.
Commercial design quote · 90 seconds
Fixed fee per m² with licence file included.
Three commercial design tiers
Pick the depth. Licence file follows.
Concept + plans
Brand-led concept, layout strategy, customer-journey study and core construction drawings. Without the licence file. Right when the local already has the right use class and you're refurbishing within an existing licence.
From
€42/m²
Delivery
4-5 weeks
Use-class verification (cadastre)included
Brand-led mood boardincluded
Two layout options + customer-flow studyincluded
Core construction drawingsincluded
3D for storefront / cash zoneincluded
Licence file (memoir + Activitats)+€1.800-3.200
Standard + licence
Full project with 3D, ventilation calc per use class, electrical with circuits per zone, plumbing for wet uses (salon/restaurant), DB-SI fire sectorisation, FF&E spec. Plus the full licence file: memòria tècnica, plans, ambiental file. The most-requested package.
From
€58/m²
Delivery
6-8 weeks
Everything in Concept + plansincluded
3D walk-throughincluded
Ventilation calc per use classincluded
Electrical + plumbing plansincluded
DB-SI fire sectorisationincluded
FF&E with supplier refsincluded
Full licence file (Activitats)included
Brand-aligned signage spec+€480
Full + supervision
Standard project plus on-site supervision through the build. Núria walks the site weekly during the build phase (commercial timelines are tighter than residential), runs the inspection-walk before opening, signs off the ventilation extract test and fire sector test. Right when the deadline is opening day, not «when ready».
From
€78/m²
Delivery
6-8 wk + build
Everything in Standardincluded
Weekly site visits during buildincluded
Pre-opening inspection walkincluded
Ventilation extract test sign-offincluded
Fire sector test sign-offincluded
Furniture supplier coordinationincluded
Outside-contractor quote reviewincluded
Common commercial design questions
Things owners ask before signing.
No — restaurant requires a different ambiental category (typically «restauración») with vertical kitchen extract, fire sector, evacuation routes by aforament. The change-of-use file is 8-16 weeks at the Ajuntament. Filed as part of Standard or Full tier (+ €1.800-3.200 depending on aforament).
Yes — Standard and Full tiers include it. We file the ambiental simplificada (under 50 people) or ordinària (above), prepare the technical memoir, attach the architect plans, pay the fee on your behalf and bill it line-by-line. Turnaround 3-12 weeks depending on category.
Façade work in Born/Gòtic and Eixample protected zones requires Patrimoni approval — separate file, 6-10 weeks added. We handle interior re-fit independently of façade; we coordinate the Patrimoni file if you want to change shopfront, signage or windows.
Class III hood with vertical extract to roof, fire damper, grease trap, makeup air. €4.500-9.500 depending on hood width, extract distance and roof access. Designed in the layout from sketch one — moving it after build is 3x the cost.
Yes — deliverable is yours. Most clients ask three contractors to quote against our drawings. We also bid on our own designs. Note: commercial timelines are tight (deadline = opening day), so picking the contractor with the right schedule capacity matters more than picking the cheapest.
Send the address of the local, the brand brief and a line about the use (retail, restaurant, salon, clinic). Núria visits within a week, runs a use-class verification, and the fixed-fee proposal lands 48h after.