Layout & planning
Measurements, work-zone study, appliance placement, technical drawings. Sign-off on the layout before we touch a tool.
Kitchen reforms · Eixample · Gràcia · Sant Gervasi
Kitchens built around how you actually cook, not the showroom layout the catalogue wanted to sell you. One team handles the lot — demolition through to the day you switch the hob on. One contract, one foreman, no chasing different trades.
KITCHEN 23 · EIXAMPLE · 2025
About the service
Kitchen renovation pulls in plumbing, electrics, ventilation, gas connections and joinery that has to fit a millimetre. We coordinate the trades and the handovers so every element lands where it was drawn, and you don't end up chasing anyone.
Measurements, work-zone study, appliance placement, technical drawings. Sign-off on the layout before we touch a tool.
Plumbing reroute, electrical first-fix, ventilation duct, gas connection if needed. All pressure-tested before walls close up.
Cabinets built in our workshop on Passeig de Maragall. Worktops cut and fitted on-site to the actual wall lines, not the drawing.
Hob, oven, hood, dishwasher, fridge installed and commissioned. Wet-test on the plumbing, defect walk, written warranty in your handover folder.
Kitchen quote · 90 seconds
Five questions, then we send a fixed quote within 24 hours of the on-site visit. Layout sketch, materials list, and the appliances you actually need — costed individually.
Three ways we work on kitchens
Full reform with a new layout, fitted-kitchen swap on the existing layout, or just the appliances and plumbing. Pick the scope and we'll fit the timeline around it.
Strip the lot and rebuild from the slab up. New layout, new pipework, new wiring, joinery built for the space, appliances chosen with you. One foreman runs the project and we wet-test the plumbing before anyone signs off. Standard 8–14 m² kitchens run 4 to 6 weeks. Knock a wall through for an island and you're looking at 6 to 8.

How we work · 6 stages
Six stages, same order every time. The layout and MEP need to be signed off before any joinery gets ordered. A fitted kitchen is a pain to change once the plumber's packed up.
Free 60-minute walk-through. We measure to the millimetre, document existing MEP, check the duct run and the hood location. Photos for the file before anyone is hired.
Within 24 hours: line-by-line PDF with the proposed layout, MEP changes, joinery list and appliance options. Each stage has its own cost line.
Sample boards on the kitchen table — Spanish stone, Catalan oak, brass and stainless steel. Joinery drawings approved before they go to the workshop.
Old kitchen out, plumbing rerouted, electrics pulled, ventilation duct extended or relocated. Pressure test on the plumbing at 6 bar for 30 minutes.
Cabinets delivered from the workshop and fitted to the actual wall lines. Worktop measured on-site, cut and laid. Appliances dropped in once the worktop is sealed.
Hob, oven, hood, dishwasher, fridge connected and tested. Wet-test on the plumbing, defect walk, keys, written 24-month workmanship warranty in the handover folder.
Materials & finishes
Spanish stone, Catalan oak, brass and stainless steel. We pick what suits the space and the way you cook, not the cheapest line in the catalogue. Sample boards go on the kitchen table before we order any joinery.
JOINERY · WORKSHOP-BUILT
Common kitchen questions
Free first consultation
Send us the apartment address, the kitchen dimensions if you've got them, and a few phone photos. Someone's round within 48 hours to walk the kitchen with you, and the fixed-price quote lands in your inbox within 24h of that visit. No deposit asked until you've signed off the scope.