Kitchen renovation package
Full renovation with project coordination and staged payments.
Leave your number — we will call within 30 minutes during working hours.
Practical kitchen renovation with clear scope and schedule

We renovate kitchens in Barcelona from planning to final cleanup. You get one team for demolition, MEP preparation, wall and floor finishes, furniture installation and final checks. We keep communication simple: scope, timeline, budget and weekly progress updates.
Kitchen renovation in Barcelona is one of the most technically demanding areas of apartment renovation. The workspace involves plumbing, electrical circuits, ventilation, gas connections and precise furniture integration. We coordinate all trades and handovers to make sure every element fits as designed — and that nothing is left for you to chase.
Measurements, functional zoning, appliance placement and technical drawings before work starts.
Demolition, plumbing/electrical prep, tiling, painting, ceiling, lighting and ventilation.
Kitchen set installation, countertop fitting, sink/hob connection and detailing.
Final quality checklist, cleanup, photo report and warranty documents.
Full renovation with project coordination and staged payments.
Safe rewiring, socket plan, water lines and drain adjustments.
Assembly, fitting and final alignment of kitchen furniture.
Most projects take 3 to 6 weeks after materials are ready. Exact timing depends on area and custom furniture lead times.
Usually yes, if renovation is limited to the kitchen. We isolate the work zone and agree noisy works by schedule.
Yes. We can offer practical options by budget and style, then prepare a shopping list with quantities.
Labour, consumables and coordination. Materials are listed separately with quantities so you can purchase yourself or have us source them.
Yes, we can reuse cabinets if they are structurally sound and adapt the layout to fit new appliances or countertop.
Yes. We check the existing duct, install or adapt the ventilation channel and connect the hood as part of the kitchen package.
Typically in three stages: deposit on start, mid-project payment at structural completion, and final payment on handover.
Kitchen renovation in Barcelona: design, materials, installation and final handover. Clear budget, fixed timeline, local team.
Get kitchen estimateWaterproofing, tiling, plumbing and fixtures. Closed and tested before handover.
→Walls, ceilings, floors and lighting. Fast turnaround without structural works.
→Made-to-measure cabinets, worktops and hardware. Designed for your space.
→