Kitchen renovation in Barcelona

Practical kitchen renovation with clear scope and schedule

Service example photo

About service

We renovate kitchens in Barcelona from planning to final cleanup. You get one team for demolition, MEP preparation, wall and floor finishes, furniture installation and final checks. We keep communication simple: scope, timeline, budget and weekly progress updates.

Kitchen renovation in Barcelona is one of the most technically demanding areas of apartment renovation. The workspace involves plumbing, electrical circuits, ventilation, gas connections and precise furniture integration. We coordinate all trades and handovers to make sure every element fits as designed — and that nothing is left for you to chase.

Planning and layout

Measurements, functional zoning, appliance placement and technical drawings before work starts.

Construction and installations

Demolition, plumbing/electrical prep, tiling, painting, ceiling, lighting and ventilation.

Furniture and finishes

Kitchen set installation, countertop fitting, sink/hob connection and detailing.

Handover

Final quality checklist, cleanup, photo report and warranty documents.

How we work

  1. Site visit and measurements — We measure the kitchen, document existing plumbing and electrical points, and identify any technical constraints before preparing the estimate.
  2. Scope and estimate — You receive a detailed written estimate broken into work types and materials. No hidden items or round-number pricing.
  3. Materials and scheduling — We help select tiles, fixtures and furniture. Once ordered, we confirm the work start date and agree weekly update checkpoints.
  4. Renovation works — Demolition, MEP preparation, tiling, plastering, painting, furniture installation and appliance connection in the agreed sequence.
  5. Handover and warranty — Final walkthrough, defect list clearance, cleanup and written warranty documents for all installations.

What is included

Kitchen renovation package

Full renovation with project coordination and staged payments.

from 290 EUR/m2

Electrical and plumbing update

Safe rewiring, socket plan, water lines and drain adjustments.

from 950 EUR

Furniture and appliance installation

Assembly, fitting and final alignment of kitchen furniture.

from 790 EUR

FAQ

How long does kitchen renovation take?

Most projects take 3 to 6 weeks after materials are ready. Exact timing depends on area and custom furniture lead times.

Can I live in the apartment during works?

Usually yes, if renovation is limited to the kitchen. We isolate the work zone and agree noisy works by schedule.

Do you help with material selection?

Yes. We can offer practical options by budget and style, then prepare a shopping list with quantities.

What is included in the estimate?

Labour, consumables and coordination. Materials are listed separately with quantities so you can purchase yourself or have us source them.

Do you work with existing kitchen furniture?

Yes, we can reuse cabinets if they are structurally sound and adapt the layout to fit new appliances or countertop.

Do you handle ventilation and hood installation?

Yes. We check the existing duct, install or adapt the ventilation channel and connect the hood as part of the kitchen package.

How is payment structured?

Typically in three stages: deposit on start, mid-project payment at structural completion, and final payment on handover.

Kitchen renovation in Barcelona

Kitchen renovation in Barcelona: design, materials, installation and final handover. Clear budget, fixed timeline, local team.

Get kitchen estimate