Bathroom renovation in Barcelona

Bathroom works with proper waterproofing and clean finishing

Service example photo

About service

We renovate bathrooms and toilets in Barcelona with a strict sequence: demolition, plumbing, waterproofing, leveling, tiling and installation. This order avoids rework and helps keep deadlines realistic. You get one point of contact and practical decisions at each stage.

Barcelona apartments — especially in buildings from the 1960s–1990s — often have outdated waterproofing, corroded copper pipes and non-standard tile formats. We account for this upfront in the assessment so the estimate includes the real scope, not a wishful one.

Technical preparation

Site protection, removal of old fixtures, plumbing and electrical adjustments.

Waterproofing and base works

Moisture protection, screed and wall leveling for durable finish.

Finishes and installation

Tile laying, sanitary equipment installation, mirrors, accessories and lighting.

Final check

Leak test, slope check, silicone sealing and handover protocol.

How we work

  1. Assessment and planning — We document the existing layout, plumbing points and wall condition. If waterproofing or screed is needed, we include it with evidence photos before works start.
  2. Detailed estimate — Broken down by stage: demolition, plumbing, waterproofing, tiling, sanitary installation and finishing. Each stage has a separate cost line.
  3. Material selection — We help choose tiles, sanitaryware and mixers within budget. We can source materials or prepare a shopping list for your purchase.
  4. Phased works — We follow a strict technical order: plumbing first, waterproofing next, then tile base, then tiles, then sanitary equipment. Skipping steps is how leaks happen — we don't skip.
  5. Leak test and handover — All drainage slopes are checked, silicone sealing is done in one pass, and we run a 24-hour wet test before signing off.

What is included

Bathroom renovation package

End-to-end bathroom renovation with coordinated stages.

from 340 EUR/m2

Shower zone conversion

Replace bathtub with walk-in shower, including drains and glass partition.

from 1350 EUR

Plumbing replacement

Upgrade pipes, valves and installation points for reliable operation.

from 980 EUR

FAQ

Do you provide waterproofing warranty?

Yes, waterproofing and installation works are covered by written warranty terms.

Can you renovate a small bathroom?

Yes. Compact bathrooms need accurate layout and storage planning, and we handle that at design stage.

Do you remove construction waste?

Yes. We organize collection and disposal after major stages and final cleanup before handover.

How long does bathroom renovation take?

A standard bathroom (4–7 m²) takes 10 to 18 working days. Larger bathrooms or those with underfloor heating or niche work take 3 to 4 weeks.

Do you install underfloor heating?

Yes, electric underfloor heating mats are included as an option. We lay them before the tile adhesive and connect them to the thermostat in the same session.

Do you work in buildings with old plumbing?

Yes. We assess the condition of existing pipes and recommend whether to reroute or keep them. Older buildings in Barcelona often need partial rerouting to meet current installation standards.

Can I choose tiles from my preferred supplier?

Yes. Provide us the tile reference, quantity and format and we incorporate it into the plan. We check sizing compatibility and adjust adhesive specification accordingly.

Bathroom renovation in Barcelona

Bathroom renovation in Barcelona: waterproofing, plumbing, tiling and installation with transparent pricing and realistic deadlines.

Get bathroom estimate