Callback →

Electrical system installation · Eixample · Sant Antoni · Sant Gervasi · Sant Martí

Electrical system installation in Barcelona
the full apartment rewire that ends the trip-and-call cycle.

When the consumer unit still has fuses, the wiring is single-core aluminium and every appliance trips the panel — patching is over. Joan Riera (master electrician on the Spanish registry) plans 12-16 circuits with a calculated section per circuit, fits a new consumer unit with RCBO selectivity, and signs the butlletí REBT for the whole apartment.

Electrical system installation in Barcelona — Joan Riera planning circuits during a full rewire of an Eixample apartment REWIRE · EIXAMPLE · 2025
28y
Master electricianJoan Riera, Spanish registry
REBT
NormButlletí signed for the full apartment
60+
Rewires deliveredApartments + villas since 2020
10 yr
LOE warrantySpanish structural law cover

About this service

The rewire is the project where section per circuit stops being a detail.

Old Barcelona apartments hide three problems behind every fuse box: undersized cable for modern loads, single-pole protection that lets neutral float, and shared circuits that trip when two appliances run together. A real rewire fixes all three at the same time, then signs a butlletí for the whole installation.

01

One marker, three pages

Diagnostic callouts in an occupied flat → electrician. New circuits added during a reform → electrical installation works. Full end-to-end rewire of every cable → this page. Different scope, different filing, different price.

02

Section calculated per circuit

1.5 mm² for lighting, 2.5 mm² for general sockets, 4 mm² for kitchen, 6 mm² for induction or oven, 10 mm² for shower. Joan calculates the section from the actual run length and the load — not catalogue defaults. Aluminium gets removed, copper goes in.

03

Selective RCBOs in the panel

One RCBO per circuit means only the offending circuit trips when there's a fault — the rest of the apartment keeps power. We use 30 mA general-purpose plus 10 mA for bathroom and kitchen. AFDD on bedroom circuits if you want the arc-fault protection added by REBT 2024.

Rewire quote · 90 seconds

Fixed price for the full installation, line by line.

Loading…

Three rewire scopes

From 1-bed apartment to villa.

One-bedroom apartment

Full rewire of a 1-bed flat 50-70 m². Eight to ten circuits: lighting, sockets, kitchen, oven, washing machine, bathroom, AC. New consumer unit with RCBO per circuit, butlletí REBT signed, contract upgrade filed with Endesa if needed.

From
€2.800
Time
7-9 days
  • Strip-out of existing wiringincluded
  • 8-10 new circuits in copperincluded
  • New consumer unit with RCBO selectivityincluded
  • Wall chasing + plaster patchincluded
  • Butlletí REBT + as-built diagramincluded
  • Endesa contract upgrade filing+€90
One-bedroom rewire — new consumer unit with RCBO per circuit

Common rewire questions

Things owners ask before signing.

Three different scopes, three different markers. Electrician handles one-off callouts in an occupied flat. Electrical installation works covers new circuits or panel additions during a reform. Electrical system installation = the whole apartment is rewired end to end with a new consumer unit. We file each one differently and the price scales differently.
In most Eixample buildings a comunicat covers a like-for-like rewire if the layout doesn't change. If walls are chased, sockets repositioned, partition added — usually llicència obra menor, 4-8 weeks at the Ajuntament. We file it as a separate line on the quote.
Seven to twelve working days for the wiring itself, plus plaster patching afterwards (separate trade). With a turnkey reform the rewire happens during the first-fix phase and adds no separate calendar time. Standalone rewire in an occupied flat is two to three weeks with a temporary feed.
No, not properly. Power gets cut zone by zone, walls get chased, plaster dust is everywhere. Phased room-by-room is possible with a temporary feed but adds 30-50% to the timeline and we still recommend you stay elsewhere for the noisiest week.
Butlletí REBT signed and stamped by Joan (registered installer), as-built single-line diagram of the panel, photos of every junction box before the wall closed, calibration sheet for each RCBO, contract paperwork to declare the new installation to Endesa. Complete folder, also digital.
4.6 kW for a 1-bed without electric heating. 5.75 kW for 2-3 bed without induction. 6.9-9.2 kW with induction or AC. 11-14.5 kW with heat pump or EV charger. Joan sizes it on the visit and files the contract upgrade with Endesa as part of the project.

Free site survey

Rewire quote in 48h after the visit.

Send the address and a photo of the existing consumer unit. Joan visits within a week, lifts a couple of sockets, inspects the cable, and the line-by-line quote arrives 48h after.