One marker, three pages
Diagnostic callouts in an occupied flat → electrician. New circuits added during a reform → electrical installation works. Full end-to-end rewire of every cable → this page. Different scope, different filing, different price.
Electrical system installation · Eixample · Sant Antoni · Sant Gervasi · Sant Martí
When the consumer unit still has fuses, the wiring is single-core aluminium and every appliance trips the panel — patching is over. Joan Riera (master electrician on the Spanish registry) plans 12-16 circuits with a calculated section per circuit, fits a new consumer unit with RCBO selectivity, and signs the butlletí REBT for the whole apartment.
REWIRE · EIXAMPLE · 2025
About this service
Old Barcelona apartments hide three problems behind every fuse box: undersized cable for modern loads, single-pole protection that lets neutral float, and shared circuits that trip when two appliances run together. A real rewire fixes all three at the same time, then signs a butlletí for the whole installation.
Diagnostic callouts in an occupied flat → electrician. New circuits added during a reform → electrical installation works. Full end-to-end rewire of every cable → this page. Different scope, different filing, different price.
1.5 mm² for lighting, 2.5 mm² for general sockets, 4 mm² for kitchen, 6 mm² for induction or oven, 10 mm² for shower. Joan calculates the section from the actual run length and the load — not catalogue defaults. Aluminium gets removed, copper goes in.
One RCBO per circuit means only the offending circuit trips when there's a fault — the rest of the apartment keeps power. We use 30 mA general-purpose plus 10 mA for bathroom and kitchen. AFDD on bedroom circuits if you want the arc-fault protection added by REBT 2024.
If the rewire is part of a bigger reform see turnkey apartment renovation or major renovation. If you only need one new circuit during an active reform see electrical installation works. If a single socket is dead see electrician.
Rewire quote · 90 seconds
Three rewire scopes
Full rewire of a 1-bed flat 50-70 m². Eight to ten circuits: lighting, sockets, kitchen, oven, washing machine, bathroom, AC. New consumer unit with RCBO per circuit, butlletí REBT signed, contract upgrade filed with Endesa if needed.

Common rewire questions
Free site survey
Send the address and a photo of the existing consumer unit. Joan visits within a week, lifts a couple of sockets, inspects the cable, and the line-by-line quote arrives 48h after.